Pile machine quality / T: 40; pile machine quality / T: 42; pile machine quality / T: 50; pile machine quality / T: 62; CFG pile diagram CFG pile is the English Cement Fly-ash Gravel is an abbreviation for cement fly ash gravel pile, composed of gravel, stone, sand.fly ash mixed cement mixed with water, using a variety of piling machinery made of variable strength of pile.Through the adjustment of cement content.ratio, the strength grade of C5-C25 changes in between, is between rigid pile.pile between a pile type.CFG pile.soil between piles with cushion layer is formed by CFG pile composite foundation to work together, so it can be based on the behavior of composite foundation.calculation in engineering design.CFG pile is generally not reinforcement calculation,.may also utilize the industrial waste fly ash.crushed stone for admixture, further reducing the project cost.
Product features:CFG螺旋钻机价格|钻机质量
1, pile machine chassis, drill out of the dirt below the chassis, so the shift is convenient, accurate positioning.
In 2, the front legs narrow rear legs wide diagonal bracing forming inverted triangle, turning the front leg impact area is small, easy to drill pile foundation pit edge angle.
In 3, the weight of large, strong overload capacity, high safety coefficient, stable.reliable operation.
In 4, the place once, at the same time can play two rows of 4 - 6 piles, efficiency can be increased by thirty percent.
Drill pipe 5, reasonable structure, good material thick leaves, strong interchangeability, high concentricity.
6, the multifunctional pile frame, can hang the other power construction, the use of a machine.
7, walking round in the boot of rail travel, durable.
8, pile machine chassis haulage, free of site disassembly process connection.
9, there are a variety of types of drill bits, can cope with a variety of complex strata construction.
In 10, skate are provided with the nylon sleeves.nylon plate wear,.protect the chute.
11, advanced hydraulic walk longer walking pace, meet bad site construction.
12, in addition to CFG23 meters (including 23 meters) below the pile machine; the arm.leg folded entirely on the machine frame, transportation as a whole haulage.Enter the scene by hydraulic control, the lift arm frame is convenient.time-saving.The host has been around the steel wire rope pulley, assembly.power head by a pin shaft can then be drilled
Tel: 13483958948 national free telephone : 400-6802-686 anxious ladyCFG螺旋钻机价格|钻机质量